Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment, Unpublished PhD Thesis, , University of Alabama.

  • Type: Thesis
  • Keywords: accuracy; time-cost trade-off; duration; uncertainty; project cost; scheduling; project manager; statistical analysis; case studies
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2054463448
  • Abstract:
    The Time-Cost Trade-Off (TCT) problem is essential to project scheduling. The risk in TCT is significant because of the uncertainty associated with the estimation of project cost and duration. TCT problem in Linear Repetitive Projects (LRP) is a more complicated issue because of their unique repetitive nature. To solve this problem, this research developed an integrated Multi-Criteria Decision-Making (MCDM) model. The objective of this model is to help project managers improve their decisions regarding Time-Cost Trade-Offs. Two case studies are used to verify and validate the MCDM model. To quantify the magnitude of improvement that the MCDM model presents comparing with other methods that have been used before, a statistical analysis was conducted. The statistical analysis shows that there is enough evidence to conclude that the difference between the results obtained from the MCDM model and the other approaches is significant. The present MCDM model could help generate a more reliable schedule and mitigate the risk of projects running over-budget or behind schedule. Further, this model is a powerful decision-making tool to help managers reduce uncertainties and improve the accuracy of Time-Cost Trade-Offs. The present MCDM model employed Fuzzy linguistic terms, which provide decision-makers with the opportunity to give their judgments as intervals comparing to fixed value judgments. In conclusion, the present MCDM model has high robustness, and it is an attractive alternative to solve the TCT problem in LRP.

Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation, Unpublished PhD Thesis, , University of Alabama.

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects, Unpublished PhD Thesis, , University of Alabama.

Egan, C M (1989) An evaluation of the effectiveness of the Mankato State university construction management program, Unpublished PhD Thesis, , University of Alabama.

Giron Matute, W A (2018) Sustainability analysis for construction companies under the LEED code, Unpublished PhD Thesis, , University of Alabama.

Harbin, K B (2020) A decision analysis tool for building renovations regarding adaptive reuse, Unpublished PhD Thesis, , The University of Alabama.

Hatamleh, M T (2020) Enhancing the management proficiencies in developing countries: The impact of project risk management within a project management maturity model on project performance, Unpublished PhD Thesis, , University of Alabama.

Macdonald, R N (2013) A strategy for materials price risk mitigation, Unpublished PhD Thesis, , The University of Alabama.

Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions, Unpublished PhD Thesis, , University of Alabama.

Nguyen, T T (2017) Modeling of clt creep behavior and real-time hybrid simulation of a clt-lifs building, Unpublished PhD Thesis, , The University of Alabama.

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods, Unpublished PhD Thesis, , University of Alabama.

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation, Unpublished PhD Thesis, , University of Alabama.

Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages, Unpublished PhD Thesis, , University of Alabama.

Shen, X (2017) Location-based leading indicators in BIM for construction safety, Unpublished PhD Thesis, , University of Alabama.

Song, S (2017) Construction equipment travel path visualization and productivity evaluation, Unpublished PhD Thesis, , University of Alabama.

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses, Unpublished PhD Thesis, , University of Alabama.

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method, Unpublished PhD Thesis, , University of Alabama in Huntsville.

Watson, S V (2010) Pre-disaster planning for transportation infrastructure recovery, Unpublished PhD Thesis, , The University of Alabama at Birmingham.